SoilBond
  • The road should be comprised of stone aggregate ranging between ¾” stone and smaller. Grade road to desired width and slope.
  • Compact aggregate road with steel drum roller (the more compaction the road has, the more effective Soil BondTM becomes).
  • Allow Soil BondTM time to cure before use of the road (24 to 72 hrs.)
  • When required repair Soil BondTM bond by applying water and Soil BondTM to treat surface.

Application Procedure

Site Preparation
  • Dry Soil: The plot should be completely dry and free from water.
  • Compaction: Compact the plot to a minimum of 95% (optional for non traffic areas).
  • Drainage: Contour and crown the plot for proper drainage.
  • Weather: The plot should be moisture free for a minimum of 72 hrs. after application.
  • The ambient temperature is 15 to 250C.

Cleaning of the application equipment
  • Rinse the equipment thoroughly with running water until clean.

Finish – Allow site to Dry / Cure
  • Curing – Allow the plot to dry and cure for a minimum of 24 to 72 hours.
  • Non Traffic Areas – Prevent any human activity over the plot.
  • Traffic Area – Prevent any human activity until fully cured.